W124 - And the works begun and abruptly stopped… Phase 1
Executive Summary:
Avoid a conman, never pay until proof of purchase is done or progress of work is reported! If a person does not have any money to fund the start of his work, just walk away.
This is the first phase of the work to be done on the W124, and estimated to be completed within a month. Work includes re-upholstery, restoration of Masterpiece interior trims, and repair of electrical for the interior.
Details:
The work on the E280 has now started, the focus for the first phase would be to refresh the interior and commence the Masterpiece trim build. In this phase, the focus will be on the interior and the work includes:
- Stripping of the current interior
- Replacing the old carpet with one that of a better condition
- Sourcing of the Masterpiece bits such as:
- Half wood steering
- Chubby/storage box
- Gearknob
- kick panels
- replace/repair the instrument cluster
- front electric seats
- door cards with seat control units
- fresh leather for the upholstery
- Treating the floor with an undercoating spray from 3M (rust protection and rubberised) - this is a DIY job and taking opportunity since the interior has been removed
- Check and repair electrical for the interior. Currently, the rear headrest is not working, rear power windows are not working as well
- One key setup for all key sockets
Timeline: 19 Aug'20 to 19 Sep'20
- The upholstery is expected to take 2–3 weeks
- Electrical check and repair is slated for 2 weeks
- Putting the interior together and checking to ensure all components are properly working — 1 week
Current status:
- Interior has been stripped
- Seats have been sent to the upholster (so it was claimed - with no evidence)
- Wiring work in progress, rear power window regulator installed, troubleshooting to have it working (but it never did)
Comments
Post a Comment